This bid is for ARFF vehicle foam transition, decontamination, and equipment removal at Southwest Florida International Airport, Station 92, 17211 Perimeter Road, Fort Myers, FL 33913, and Page Field, Station 91, 4682 Terminal Access Drive, Fort Myers, FL 33907.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Florida bid is posted.
What the job is
Vehicle transition: Drain and clean seven ARFF vehicles with a non-hazardous PFAS-mobilizing cleaner and at least five cleaning/rinsing cycles using water above 130°F and no higher than 180°F. Refill with owner-supplied ECOPOL A3+ fluorine-free foam.
Testing: Perform input-based and output-based testing, including proportioning at 2.8%–3.5%, expansion, and drainage verification under NFPA 460.
Equipment removal: Remove one 1,000-gallon fiberglass tank at Station 91 and two 2,000-gallon HDPE tanks on Station 92's mezzanine, plus associated pumps, reels, hoses, and piping, including approximately 800 feet of PVC at Station 92. Keep existing water service operational.
Waste disposal: Contain, transport, and dispose of approximately 2,000 gallons of stored AFFF, vehicle foam, rinsate, contaminated equipment, 37 empty drums, and four unopened AFFF drums at a chemically secure Subtitle C RCRA landfill. Provide disposal documentation.
Site and schedule: Fit the contained cleaning system within 60'L × 30'W × 15'H. Complete within 120 calendar days: 30 for mobilization, 60 for vehicle transition, and 30 for demolition. Work Monday–Friday, 7 a.m.–4 p.m., with only one vehicle out of service at a time.
Pricing: Include all labor, equipment, containment, testing, and disposal, with phase totals, per-vehicle costs, and disposal unit rates for concentrate, rinsate, drums/totes, and dry waste.