Coral Shores High School: 89901 Old Highway, Tavernier, FL 33070 — 2 condensing units and 2 air handling units.
Marathon High School: 350 Sombrero Beach Road, Marathon, FL 33050 — AHU 5.2.1 and equipment serving MAU 3.3.
Sugarloaf School: 255 Crane Boulevard, Upper Sugarloaf Key, FL 33042 — 3 condensing units and 1 air handling unit.
Key West High School: 2100 Flagler Avenue, Key West, FL 33040 — 2 condensing units and 2 air handling units.
Poinciana Elementary School: 1407 Kennedy Dr, Key West, FL 33040 — 2 condensing units and 2 air handling units.
Horace O’Bryant School: 1105 Leon St, Key West, FL 33040 — 2 condensing units and 1 air handling unit.
Equipment: Addison, Carrier, York, or approved equivalent; no Daikin. Scroll compressors, EER greater than 10, and R-454B refrigerant subject to compatibility and code requirements. Conventional copper-tube/aluminum-fin coils only, with factory corrosion protection.
Complete installation: Include engineering, labor, materials, permits, removal/disposal, lifting, required piping, electrical, controls, drainage, ductwork and support modifications, testing, balancing, startup, and commissioning.
Schedule and warranty: Start on or after June 1, 2027; target completion August 1, 2027. Include a five-year parts warranty and materials/workmanship coverage.
Site visits: Mandatory November 4, 2026, at each location quoted: Coral Shores 8:00 AM; Marathon 9:30 AM; Sugarloaf 10:45 AM; Key West High 11:45 AM; Poinciana 12:50 PM; Horace O’Bryant 1:30 PM.
Pricing: Provide a separate all-inclusive lump-sum quote for any or all sites. A current Florida Certified Mechanical Contractor license is required.