This bid is for stormwater flood reduction design and permitting in the Five Corners neighborhood, City of Groton, Connecticut.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Connecticut bid is posted.
What the job is
Sites: Curb inlet planters on Mitchell Street between Five Corners and Baker Avenue and Smith Street between Baker Avenue and Hamilton Avenue; bypass pipes on Hamilton and Ledyard Avenues; and improvements and bio-infiltration at Smith/Allen corner park.
Investigations: Quality Assurance Project Plan approval, topographic surveys, drainage and utility verification, boundary verification, soil and infiltration testing, and tree assessments.
Design: Advance existing concepts to construction-ready drawings, specifications, and cost estimates, including a Basis of Design Report. Include 30%, 50%, 90%, and 100% submissions, with two review cycles at 50% and one at each other milestone.
Additional services: Permit applications through approval, project management, support for at least 10 stakeholder meetings/events, and an implementation funding and phasing strategy.