Controller: Install a supplied 332L cabinet for the northbound ramp signal, transfer existing emergency vehicle preemption cards, and install a battery backup system with supplied electronics.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar California bid is posted.
What the job is
Electrical work: Modify foundations, pull boxes, conduit, wiring, detectors, and service equipment; reroute and reuse existing cables where specified. Coordinate service disconnection and reconnection with PG&E.
Materials: Use Type 3 underground conduit, Type B detector lead-in cable, Type 2 loop wire, Method B splice insulation, and hot-melt rubberized slot sealant.
Pickup: Collect supplied cabinets and equipment from 850 Elvee Drive, Salinas, California, with at least 48 hours’ notice.
Site support: Include construction signs, traffic control, portable changeable message signs for off-ramp closures, site management, a lead compliance plan, and a water pollution control program.
Schedule: Complete within 20 working days; start before September 1, 2027.