Removal: Remove the existing propane generator, integrated ATS/panelboard, and associated conduits and conductors.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar California bid is posted.
What the job is
Generator: Supply and install a 20kW/25kVA, 240/120V, single-phase, 3-wire, 80% power factor propane standby generator with a NEMA 3R Level II sound-attenuated enclosure and a 20-foot exhaust extension with support brackets.
Electrical and fuel connections: Install a 100A, 240/120V, single-phase, 3-wire, 10kAIC, 16-circuit, NEMA 3R integrated ATS/panelboard with switched neutral; reconnect existing branch circuits and propane piping, and provide new power/control conduits and conductors.
Site work: Install three bollards, maintain at least 3 feet of generator clearance, and provide temporary standby power for backed-up circuits without interrupting site operations.
Pricing: Include labor, materials, equipment, permits, inspections, and debris disposal. C-10 electrical and C-36 plumbing licenses are required through the contractor or subcontractors.
Schedule: Work is planned for January–June 2027. A mandatory site walkthrough is available October 21–23, 2026, between 8 a.m. and 2 p.m.