This bid is for design-build installation of an emergency backup generator system at Carnegie Center (Navigation Center), 1815 Carnegie Center, Santa Ana, CA 92705.
Due
December 22, 2026
26 days left
Location
Santa Ana, CA
California
Posted on
vendors.planetbids.com
Notice ID
27-035A
Please quote design-build installation of an emergency backup generator system at Carnegie Center (Navigation Center), 1815 Carnegie Center, Santa Ana, CA 92705.
Design: Verify existing conditions and backup loads, assess a 220 kVA, 3-phase, 480V Generac diesel generator, and recommend a larger unit if needed, including engineering and permits.
Electrical: 400A NEMA 3 automatic transfer switch, indoor EM 400 panel with main breaker, feeders, conduit, wiring, and integration with existing systems.
Backup loads: Life safety, lighting, elevator, critical refrigeration, communications, security, data room, and six spare 120V circuits, with power active within 10 seconds.
Optional: First-floor HVAC backup priced as an option.
Installation: Furnish all equipment and supporting infrastructure, including fuel system, pad, enclosure, and exhaust, plus temporary power to keep the occupied shelter running.
Completion: Startup, transfer and applicable load bank testing, training, as-built drawings, manuals, warranties, and at least 60 days of post-installation support.
Please confirm availability and send your quote by December 22, 2026.
What it takes to win this job
No close past price for this exact job. Past awards for this kind of work were too far apart in size and price to give one fair number.
Price it from your own costs. Ask the buyer what they paid the last time they bought this.
To win it, you need
Required site walk: Attend the mandatory site meeting on December 2, 2026, at 9:00 a.m. at the project location.
Quote submission: Confirm availability and send a fixed-price quote broken down by design, procurement, installation, testing, training, and support.
Conflicting dates: The description requests quotes by December 20, 2026, while the posting lists December 22, 2026, as the due date.
Generator sizing: Assess a 220 kVA, 3-phase, 480V Generac diesel generator and recommend a larger unit if needed.
Backup power: Emergency power must activate within 10 seconds.
The original documents
Deadline: December 22, 2026
See the original on vendors.planetbids.com
Bidding it yourself? Get the full package and submit on vendors.planetbids.com before December 22, 2026.
What they need
Design and sizingVerify existing conditions and backup loads; assess a 220 kVA, 3-phase, 480V Generac diesel generator and recommend a larger unit if needed. Include engineering and permits.
ElectricalInclude a 400A NEMA 3 automatic transfer switch, indoor EM 400 panel with main breaker, feeders, conduit, wiring, and integration with existing systems.
Backup loadsSupport life safety, lighting, elevator, critical refrigeration, communications, security, and data room loads, plus six spare 120V circuits. Emergency power must activate within 10 seconds; price first-floor HVAC backup as optional.
InstallationFurnish all equipment and supporting infrastructure, including required fuel system, pad, enclosure, and exhaust components. Include temporary power as needed to maintain occupied shelter operations.
CompletionInclude startup, transfer and applicable load bank testing, training, as-built drawings, manuals, warranties, and at least 60 days of post-installation support.
Site walkMandatory meeting on December 2, 2026, at 9:00 a.m. at the project location.