Equipment: Flashover Simulator ST-PRO with a 20 ft (±1 ft) observation/transition module, 10 ft (±1 ft) raised burn chamber, and recessed observation area for 10 participants.
Can you do this job? Tell us your price.
We write the bid, handle the paperwork, and submit it for you. No upfront fees.
Got it.
You send a priceOne number, before October 26, 2026.
We bid itXL Eagle submits the bid as the main contractor.
You do the workIf it is awarded, you do the job as our subcontractor.
Construction: Minimum 16-gauge steel shell, 11-gauge interior liner, 10-gauge burn chamber floor with concrete pavers at least 1¼ inches thick, and protected insulation rated at least 1100°F.
Burn and ventilation systems: Class A fuel retention chains, 55-gallon crib fire drum or fuel crib, instructor-controlled roof vent, fresh-air opening, smoke trench vent, heat baffles, hose access, and drainage.
Access and safety: Two outward-opening, non-locking side doors; supported raised burn chamber; and an 8 ft × 8 ft staging platform with non-skid stairs and guardrails. Meet NFPA 1402/1403 and applicable structural, insulation, and workplace safety standards.
Training: One day of live, on-site operational and safety training upon delivery by at least one NFPA-certified instructor.
Pricing and lead time: Include freight prepaid, assembly, installation, warranty details, and estimated delivery timing. Completion within 10 weeks is preferred.