Electrical work: Install and connect EV charging infrastructure, wiring devices, and associated components per plans, including accessible charging ports and required system testing.
Site work: Include saw cutting, trenching, backfilling, pavement restoration, and required protective bollards.
Schedule: Complete within 60 calendar days of the authorized start date; normal work hours are 7:30 a.m.–5:00 p.m.
Pricing: Provide a lump-sum quote covering labor, materials, equipment, and applicable prevailing wages.