Modernization: Replace existing Oliver & Williams controls with a non-proprietary SmartRise or Alpha Controls system, traveling cable, landing system, door operator and hardware, ADA fixtures, and fire-service safety upgrades.
Due
November 30, 2026
12 days left
Location
California
Posted on
rampla.org
Notice ID
232845
Please quote hydraulic elevator modernization and 2027 to 2031 monthly maintenance, plus a separately priced cab renovation option, for the elevator at Wyandotte Apartments, 19424 W. Wyandotte Street, Reseda, CA 91335.
Modernization: Replace the existing Oliver & Williams controls with a non-proprietary SmartRise or Alpha Controls system, traveling cable, landing system, door operator and hardware, ADA fixtures, and fire-service safety upgrades.
Kept equipment: Keep the hydraulic jack, piping, pump, valve, platform, sling, cab shell, rails, guides, and existing doors, and keep the same capacity, speed, travel, and stops.
Installation: Include engineering, labor, materials, permits, inspections, testing, disposal, and at least a one-year warranty. Work must meet ASME A17.1, ADA, and local codes.
Cab alternate: Price separately: laminate wall panels, stainless steel trim and handrails, ceiling and LED lighting, protective pads, Braille signage, and Idaho SK7010 or equivalent 6.5 mm SPC flooring with a 20 mil wear layer.
Maintenance: Monthly preventive maintenance for 2027 to 2031, with six visits in 2027, normal-wear parts coverage, monthly fire-service testing, 24/7 live phone help, and a two-hour maximum service response.
Testing and repairs: Separately price annual Category 1 testing, annual Category 5 testing, and regular, after-hours, and overtime repair rates.
Please confirm availability and send your quote by November 30, 2026.
The original documents
Deadline: November 30, 2026
See the original on www.rampla.org
Bidding it yourself? Get the full package and submit on rampla.org before November 30, 2026.
What they need
Retained equipmentKeep the hydraulic jack, piping, pump, valve, platform, sling, cab shell, rails, guides, and existing doors; maintain existing capacity, speed, travel, and stops.
InstallationInclude engineering, labor, materials, permits, inspections, testing, disposal, and a minimum one-year warranty. Meet ASME A17.1, ADA, and applicable local codes. Provide equipment lead time and anticipated elevator downtime.
Cab renovation alternatePrice separately for laminate wall panels, stainless steel trim and handrails, ceiling and LED lighting, protective pads, Braille signage, and Idaho SK7010 or equivalent 6.5 mm SPC flooring with a 20 mil wear layer.
MaintenanceQuote 2027–2031 monthly preventive maintenance, including six visits in 2027, normal-wear parts coverage, monthly fire-service testing, 24/7 live telephone assistance, and a two-hour maximum service response. Separately price annual Category 1 testing, Category 5 testing, and regular, after-hours, and overtime repair rates.
Pricing requirementsInclude applicable prevailing wages and a 100% modernization payment bond; a C-11 elevator contractor license is required.
Other recent awards in this industry in California
Recent federal contract awards (federal buyers) in the same industry in California, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.