The government needs fabrication, assembly, testing, inspection, packaging, and delivery of a Target Service Shield at Oak Ridge National Laboratory (ORNL).
8.12.1 Measuring and Test Equipment Requirements M&TE used for process monitoring, inspections, tests, product certifications, and acceptance shall be calibrated, and its accuracy shall be certifiedSource: Attachment 5, page 50
Calibrations shall be performed against and traceable to certified equipment or reference standards having known, valid relationships to nationally recognized standards or to international standards known to be equivalent to corresponding nationally recognized standardsSource: Attachment 5, page 50
3Pricing format
If a leak is found, bolts should be tightened not more than ¼ turn at a time and not to exceed the maximum torque from Table A3-1Source: Attachment 2, page 4
The Supplier and TPO shall establish a recurring fabrication update meeting not to exceed 1 month between meetingsSource: Attachment 6, page 9
Other recent awards in this industry in Tennessee
Recent federal contract awards in the same industry in Tennessee, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.