XL Eagle Send us your price
Federal government job · open for prices

Lead and PCB soil cleanup in Matawan, New Jersey

The government needs remediation of lead- and PCB-contaminated soil, disposal, and site restoration at the FAA QPI RCAG facility in Matawan, NJ.

Due
November 23, 2026
2 days left
Location
Matawan, NJ
New Jersey
Buyer
Office of the Secretary
Volpe Natl Trans Sys Cntr · Department of Transportation
NAICS
238910
Site Preparation Contractors
Notice ID
6913G627Q300003
Posted November 16, 2026

Please quote remediation and restoration work to remove lead- and PCB-contaminated soil at the QPI RCAG site in Matawan, New Jersey.

  • Services: Remove contaminated soil, dispose of it, and restore the site.
  • Work plan: Draft Remediation and Restoration Work Plan due within 10 business days of the kick-off meeting, and a final plan within 5 business days of receiving comments.
  • Plan contents: Technical approach, required permits, Site Safety and Health Plan, and a brief Risk Management Plan.
  • Disposal: A Licensed Site Remediation Professional selects and approves the disposal facilities; the contractor handles disposal sampling and paperwork.
  • Standards: Follow Federal, State and local rules, using the most stringent where they differ.
  • Cleanup levels: Soil with lead above 200 mg/kg or PCBs above 0.25 mg/kg exceeds action levels; confirmatory sampling is already done.

Please confirm availability and send your quote by November 23, 2026.

What it takes to win this job

No close past price for this exact job. Past awards for this kind of work were too far apart in size and price to give one fair number.

Price it from your own costs. Ask the buyer what they paid the last time they bought this.

To win it, you need

  • Set-aside: This is a total small business set-aside under NAICS 238910.
  • Deadline: Quotes are due 2026-11-23.
  • Draft work plan: Send a draft work plan within 10 business days of the kick-off meeting.
  • Final work plan: Send the final work plan within 5 business days of getting comments.
  • Rules to follow: Follow Federal, State and local rules, and use the most strict one where they differ.

The original documents

Deadline: November 23, 2026

  • Attachment 1 PDF · 15 pages
  • Attachment 2 PDF · 1 page
  • Attachment 3 PDF · 15 pages
  • Attachment 4 PDF · 6 pages
  • Attachment 5 PDF · 1 page
  • Attachment 6 PDF · 3 pages
  • Attachment 7 PDF · 7 pages
  • Attachment 8 PDF · 41 pages

See the original on sam.gov

Bidding it yourself? Search notice 6913G627Q300003 on SAM.gov and submit before November 23, 2026. You need an active SAM.gov registration.

What they need

  • Scope of workRemove lead- and PCB-contaminated soil, dispose of it, and restore the site, using the quantities and depths in the SOW and prior site reports as a guide.
  • Work Plan deadlinesSubmit a draft Work Plan within 10 business days of the kick-off meeting, then a final within 5 business days of receiving Volpe Center comments.
  • Work Plan contentsInclude the technical approach, required permits, a Site Safety and Health Plan, and a Risk Management Plan.
  • Cleanup action levelsSoil above 200 mg/kg lead or 0.25 mg/kg PCBs exceeds FAA action levels, and confirmatory sampling is already done.
  • Disposal responsibilitiesA Licensed Site Remediation Professional picks and approves the disposal facilities, and the contractor handles disposal sampling and paperwork.
  • Compliance standardFollow all Federal, State, and local requirements, and use the most stringent one where they conflict.
  • How longPeriod of performance runs from notice to proceed through May 31, 2027.Source: Attachment 3, page 6

What you have to submit

Pulled from the 8 solicitation documents (89 pages). Each item links to the page it came from. Check the originals and any amendments before you bid.

1How and where to submit

2Deadline

3Forms to fill out

4Questions deadline

  • Questions go by email to roland.regan@dot.gov on or before 16 November 2026 at 1:00 PM Eastern Time.Source: Attachment 4, page 1

5Pricing format

  • Firm-fixed price quote must include a price for labor and equipment charges for CLIN 00100.Source: Attachment 4, page 2
  • Travel costs must be built into line item pricing and the total fixed price amount.Source: Attachment 3, page 6
  • The contractor must include a schedule for completing the SOW tasks with the cost proposal.Source: Attachment 3, page 6

Other recent awards in this industry in New Jersey

Recent federal contract awards in the same industry in New Jersey, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.

Who wonAmountBuyerDate
Eagle Demolition & Environmental INCNJ-edwin forsythe NWR-demolition services $30,227U.S. Fish and Wildlife ServiceSep 2026
Coastal Ventures CorpNawc drilling services $5,932U.S. Geological SurveySep 2025
Schmidt Industrial Services LLCEpoxy floor coating service requested by station Philadelphia $18,757U.S. Coast GuardJul 2025
Northland Airboats L.l.cNJ edwin B forsythe NWR marsh restore $50,000U.S. Fish and Wildlife ServiceJul 2025
Jd Bravo CO INCEarrthwork services $3,235,269Department of the ArmyMar 2025
Worrell Contracting CO INCBNC & FPNC internments, grave excavation & backfilling of casketed & cremated remains $291,400Department of Veterans AffairsSep 2024
Arctic Peak LLCManeuver trail maintenance and repair to reduce the long-term impacts of increased maneuver training at Joint … $1,590,930Departmental OfficesSep 2024
Fullard Environmental Controls, INC.642154; demolition of pier 2; CMS-1236 $465,419U.S. Coast GuardMar 2009

Losing bids are not made public on most government buys, so only the winner and price are shown.

Similar open contracts