Please quote repairs to the New Meadows Range Barn at 100 S Norris Ave., New Meadows, Idaho 83654, including roof and siding replacement, lead paint removal, exterior painting, waterline and hydrant work, and optional deck replacement.
Please confirm availability and send your quote by November 28, 2026.
Deadline: November 28, 2026
See the original on sam.gov
Bidding it yourself? Search notice 1240LT27Q0027 on SAM.gov and submit before November 28, 2026. You need an active SAM.gov registration.
A. This project consists of modifying an existing waterline and replacing a water hydrant, removing an existing wood deck and constructing a new metal deck, replacing the existing roof, abatement of lead-based paint, removing lead-based paint siding, installing new siding, and preparing and painting exterior surfaces of the New Meadows Range Barn located at the New Meadows Barracks administrative site located at 100 S Norris Ave. New Meadows, ID 83654.
B. Base work includes the following described below: 1. Removal of existing roofing, installation of plywood sheathing over the existing skip sheathing, installation of ice/water shield over the entire roof, and installation of new corrugated metal roofing.
2. Abatement of lead-based paint of rafter tails, soffit, & fascia; and painting of aforementioned surfaces. 3.
Removal of lead-based paint siding and felt paper, installation of plywood sheathing and building wrap, installation of new siding in-kind, installation of new trim in-kind around the windows, doors, and corners and painting of all aforementioned surfaces. 4. Replacement of approximately 10-feet of existing 1-inch SIDR 9 HDPE waterline including moving the existing hydrant location 2-feet to the east along the side of the building and replacement of the existing hydrant with a new hydrant and drainage basin.
Additionally, replacement of an existing galvanized barb fi
Recent federal contract awards in the same industry in Idaho, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
| Who won | Amount | Buyer | Date |
|---|---|---|---|
| Xenturis LLCPipeline replacement, including AIR release valves, drains, and concrete thrust blocks. | $53,539 | Forest Service | Aug 2026 |
| Parliament LLCLateral move irrigation system | $378,491 | Agricultural Research Service | Aug 2026 |
| Geotech Environmental Services, INC.Dubois, ID - water system improvements. install NEW water well, decommission existing water well, replace wate… | $686,845 | Agricultural Research Service | Jun 2026 |
| Roach Construction Company, LLCThis project includes assessing current site conditions to find the best possible solutions for the following:… | $15,000 | Forest Service | May 2026 |
| Hiddleston & Son, INC.Decommission a 400-FOOT monitoring well | $5,320 | Department of the Air Force | Mar 2026 |
| Yoy INCEmergency repair of a broken underground water line supplying greenhouse irrigation system at the coeur d'alen… | $3,394 | Forest Service | Nov 2025 |
| Yale Creek INC0414 gaoa BIG smoky admin site deferred maintenance | $544,543 | Forest Service | Oct 2025 |
| Joshua LillieHammer creek septic system replacement for the blm-cottonwood field office, idaho | $28,999 | Bureau of Land Management | Sep 2025 |
Losing bids are not made public on most government buys, so only the winner and price are shown.
More like this: Construction & Renovation contracts in Idaho · Water & Wastewater contracts in Idaho