Please quote HVAC upgrades, including exhaust fan replacement, air handler cooling coil and motor replacement, a new variable frequency drive, and heat tracing for the chillers, at Building 1 Community Living Center, VA Maryland Health Care System, Loch Raven Campus.
Please confirm availability and send your quote by November 30, 2026.
No close past price for this exact job. We found fewer than 3 past awards for this same work, which is too few to give a fair price.
Price it from your own costs. Ask the buyer what they paid the last time they bought this.
Deadline: November 30, 2026
See the original on sam.gov
Bidding it yourself? Search notice 36C24527Q0061 on SAM.gov and submit before November 30, 2026. You need an active SAM.gov registration.
Presolicitation Notice Presolicitation Notice Page 5 of 5 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 5 The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road.
Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD.
Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic.
AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with J
Pulled from the 8 solicitation documents (64 pages). Each item links to the page it came from. Check the originals and any amendments before you bid.
Recent federal contract awards in the same industry across the US, from USAspending.gov. These are other jobs, not the same work as this one. Do not use them as a price guide for this job.
| Who won | Amount | Buyer | Date |
|---|---|---|---|
| Installation Services LLCInstallation | $473,577 | Office of the Secretary | Jul 2027 |
| Siemens Industry INCSiemens air gapped system. | $127,768 | Department of the Air Force | Jul 2027 |
| Fluid Solutions LLCAnnual inspection, testing, and maintenance of the sprinkler, fire alarm, and fire pump systems | $382,341 | Department of State | May 2027 |
| Installation Services LLCInstallations services | $381,604 | Office of the Secretary | May 2027 |
| Installation Services LLCInstallation services. | $17,844 | Office of the Secretary | May 2027 |
| Capital Brand Group LLCHotd - rental chiller services in support of chiller plant outage | $2,780,171 | Public Buildings Service | Jan 2027 |
| Teamgov, INC.Operations and maintenance services at six locations in state of Oregon | $3,467,088 | Public Buildings Service | Jan 2027 |
| Veteran Elevated Solutions, LLCElevator maintenance and repair services | $120,320 | Department of Veterans Affairs | Dec 2026 |
Losing bids are not made public on most government buys, so only the winner and price are shown.