Deadline: December 4, 2026
See the original on sam.gov
Bidding it yourself? Search notice SPRTA1-27-R-0001 on SAM.gov and submit before December 4, 2026. You need an active SAM.gov registration.
Synopsis PR: FD2030-25-00800 1. Estimated issue date and estimated closing/response date: Issue: October 5, 2026 Closes: November 4, 2026 2. RFP# SPRTA1-27-R-0001 Request for Proposal 3.
Service/Spare/Repair/OH: Spares 4. AMC: 1/C 5. Nomenclature/Noun: Cylinder, Assembly, A 6.
NSN: 1650-00-741-3109 7. PN: 3-43260-505 8. History: No recent DLA procurement history 9.
Description/Function: Cylinder, Assembly, A. DIMENSIONS, 27.0 INCH (L) BY 10.0 INCH (W) BY 9.3 INCH (H). 11.0 POUNDS (WEIGHT).
MATERIAL CONTENT, Metal Alloy. Applies mechanical inputs to the rudder actuator to obtain flight control corrections. APPL.
TO T-38. 10. Total Line Item Quantity: 0001AA Bid A (First Article Required) 2 each Cylinder, Assembly, A (FA) 0001AB Bid A (First Article Required) 1 lot FA Test Report 0001AC Bid A (First Article Required) 1 lot Certification of Material 0001AD Bid A (First Article Required) 1 lot Certificate of Compliance 0001AE Bid A (First Article Required) 6-38; 23 each Cylinder, Assembly, A (Production) 0002 Bid B (If First Article Waived) 6-38; 25 each Cylinder, Assembly, A (Production, No FA) 11.
Application (Engine or Aircraft): T-38 12. Destination: SW3210, Hill AFB, UT 13. Required Delivery: On or Before 31 December 2027 14.
Qualification Requirements: Contractor must be an approved source. 15. Export Control Requirements: Yes 16.
UID: UID requirements will apply. 17. Qualifi
Recent federal contract awards in the same industry across the US, from USAspending.gov. These are comparable jobs, not earlier rounds of this exact solicitation.
| Who won | Amount | Buyer | Date |
|---|---|---|---|
| Bell Boeing Joint Project OfficeNon-recurring engineering | $19,719,583 | Department of the Navy | Mar 2028 |
| Parker-Hannifin CorporationManufacturing and remanufacturing of valves, pumps, fuel nozzles, sensors,indicators, manifolds, etc. to suppo… | $4,016,832 | Department of the Air Force | Feb 2028 |
| Atap INCSourcing and acquiring common stock equipment VIA strategic replenishment contract(src) | $3,565,880 | Department of the Air Force | Nov 2027 |
| Ge Aviation Systems LLCFY26 india software | $55,344 | Department of the Air Force | Sep 2027 |
| Cpi Aerostructures INC | $10,676,845 | Department of the Air Force | Sep 2027 |
| Bae Systems Information and Electronic Systems Integration INC.Aflcmc/wi | $66,848,688 | Department of the Air Force | Aug 2027 |
| Avenger Aerospace Solutions INCDesign, delivery, and integration of subsystem products for the geometry optimization and sensing with integra… | $1,508,500 | National Aeronautics and Space Administration | Aug 2027 |
| Gulfstream Aerospace CorporationGulfstream maintenance library / g-iv | $16,900 | National Aeronautics and Space Administration | Jul 2027 |
Losing bids are not made public on most government buys, so only the winner and price are shown.