This bid is for Phase II design engineering services for highway, bridge, and transportation system improvements across Ogle, DeKalb, Kane, Cook, DuPage, Lake, Winnebago, Boone, and McHenry Counties, Illinois.
This bid has closed.
Buyers often post the same work again. Set an alert below and we will email you when a similar Illinois bid is posted.
What the job is
I-88 reconstruction: Roadway reconstruction and bridge rehabilitation from IL Route 251 to IL Route 56, mileposts 76.0–113.6, in Ogle, DeKalb, and Kane Counties; includes corridor design management.
Roadway rehabilitation and widening: I-294 from 171st Street to 159th Street and I-94 from I-294 to Edens Expressway in Cook County, including plaza improvements; I-88 widening from Highland Avenue to IL Route 83 in DuPage County.
Bridge reconstruction: Roselle Road over IL 390 in Cook County; Atkinson Road and Everett Road over I-94 in Lake County; Rockton, Harlem, Spring Creek, and Rote Roads over I-90 in Winnebago County.
Fiber optic and traffic systems: Fiber cables, conduit, and communications design along I-90 from Rockton Road to Elgin Plaza, mileposts 2.2–53.8, in Winnebago, Boone, McHenry, and Kane Counties; active traffic management design along I-94 from Grand Avenue to O’Plaine Road, mileposts 8.5–12.0, in Lake County.
Noise walls: Noise studies, wall design, geotechnical support, and preliminary roadway geometry along I-355 from I-55 to Army Trail Road in DuPage County, excluding mileposts 17.2–22.6.
Interchange improvements: I-294 at Irving Park Road in Cook County; new ramps and flyover, Mannheim Road widening, traffic signal modifications, retaining walls, toll plaza, drainage, and lighting design.
Deliverables and staffing: Engineering studies, drawings, specifications, permits, CADD models, applicable supporting disciplines, and construction-phase design support. Relevant discipline prequalification, Illinois-licensed engineers, and independent design quality reviewers are required.
Schedule: Anticipated start in 2027; design periods range from 12–24 months, with overall assignments lasting approximately 24–48 months depending on the project.