XL Eagle Send us your price
Georgia bid · open for prices

DC/UPS System Supply

Cope Energy Facility, Dalton Utilities, 1232 V.D. Parrot Jr Pkwy, Dalton, GA 30721, Whitfield County.

Due
November 11, 2026
12 days left
Location
Dalton, GA
Georgia
Posted on
ssl.doas.state.ga.us
Notice ID
PE-75553-NONST-2027-000000066

What they need

  • BatteryOne 125 VDC, 60-cell vented lead-acid battery with racks, spill containment, lifting device, and monitoring system meeting NERC PRC-005-06. Size for a 120-minute duty cycle: 1,360 A first minute, 1,152 A next 118 minutes, and 1,223 A final minute; 20-year service life at 70°F, 1.25 aging factor, and 15% design margin.
  • ChargersTwo fully redundant, parallel-capable chargers with 480 VAC, three-phase, 60 Hz input; each must support continuous DC loads while fully recharging the battery within 24 hours.
  • UPSOne 40 kVA inverter, 105–140 VDC input and 120 VAC single-phase output, with integral static transfer switch providing transfer in less than 4 ms; include manual bypass and a 40 kVA, 480-to-120 VAC isolation transformer/voltage regulator.
  • DistributionOne 125 VDC nominal, 250 VDC-rated switchboard with minimum 1,600 A copper bus; two 120 VAC UPS panelboards; two 125 VDC nominal, 250 VDC-rated panelboards; one fused battery disconnect and one non-fused load-test disconnect.
  • Included servicesEngineering, manufacturing, factory testing, documentation, DDP delivery, startup and field testing support, two days of onsite training, and required startup spares and special tools.

Similar open bids

Original listing

See the original on ssl.doas.state.ga.us ↗

Bidding it yourself? Get the full package and submit on ssl.doas.state.ga.us before November 11, 2026.

Get new Georgia bids by email

Save a search and we email you when a matching bid is posted. Free. Unsubscribe anytime.

More Georgia bids → · All states →