We are seeking quotes for debris management improvements to the Auxiliary Water Supply Backup system at The Dalles Dam.
Project Type: This is a firm-fixed-price, design-bid-build construction requirement.
Work Scope: Provide a predesigned mechanical method to dislodge debris from trash racks at the East Fish Ladder Auxiliary Water Supply Backup intake.
Operating Goal: The system must eliminate the need to shut down the Auxiliary Water Supply Backup system so river currents can clear screen debris.
Site Visit: A site visit is scheduled for 10:00 a.m. PDT on July 21, 2026, at The Dalles Dam.
Drawing Access: Access to the controlled drawing attachment requires at least CMMC Level 2 Self verification and submission of the vendor's CMMC Unique Identifier Number and CAGE Code.
Apply for this opportunity
Just your email — we'll send the details and the next step right away.
You're in. Check your inbox — we just emailed you the next step. Reply with your quote and XL Eagle handles the rest.