View full contract details ↓ View on SAM.gov ↗
Amendment 1 � Q&A � 16 Sep 26 Question1. The PWS references two 20-foot manual sliding security gates and also states that two 20-foot manual gate openings are to be installed. Please confirm whether the requirement is for two separate 20-foot manual sliding gate openings, or one 40-foot opening consisting of two 20-foot sliding gate leaves that close together. Answer 1: The requirement is for two separate 20-foot manual sliding gates.
Question 2. Gate Configuration: PWS Paragraph 5.1 identifies two 20-foot manual sliding security gates, while Paragraph 5.1.5 references �swing clearance.� Please confirm whether the required gates are manual sliding gates, swing gates, or another configuration. Answer 2: The requirement is for two separate 20-foot manual sliding gates. Question 3.
Field Measurements / Site Access: The PWS requires the contractor to verify all measurements prior to submitting a quotation. Will the Government conduct a scheduled site visit or otherwise provide access to Load Line 6 for prospective contractors to perform the required field verification before the quotation due date? Answer 3: Site visits can be scheduled by contacting CW2 Grant Stoner (614-336-6580, grant.m.stoner.mil@army.mil) or MAJ Kyle Miller (kyle.r.miller56.mil@army.mil). Question 4.
Fence Alignment / Drawings: Are drawings, site plans, maps, or other documents available identifying the exact proposed fence alignment and locations of the two 20-foot gates? Answer 4: Yes, drawing is attached and ARNG will perform layout prior to fencing installation after the vegetation clearing is complete. Question 5. Completion Schedule: The PWS states a six-month period of performance from contract award; however, the solicitation instructions require a proposed schedule demonstrating completion pr…
More like this: Fencing contracts in Ohio
XL Eagle · Certified Small Business · CAGE 11R42 · info@xleagle.com · (832) 380-5845