We are seeking quotes for repair, testing, and inspection of signal processors and similar replacement parts at the contractor's facility.
Repair Scope: Inspect, repair or replace components, reassemble, test, and obtain Government acceptance for returned assets.
Turnaround Time: NIIN 015469311 and NIIN 015634028 each require acceptance within 36 days after asset receipt.
Quality Standard: The contractor must maintain an ISO 9001 higher-level quality system.
Technical Compliance: Use SAE-AS22759 wire instead of prohibited MIL-W-81381 wire and provide IPC/EIAJ-STD-001C-trained and certified personnel when applicable.
Contractor Equipment: The contractor must provide all fixtures, tooling, test equipment, and other manufacturing aids needed for repair and testing.
Performance Period: Assets may be inducted through 365 days after contract award, and early or incremental deliveries are accepted.
Apply for this opportunity
Just your email — we'll send the details and the next step right away.
You're in. Check your inbox — we just emailed you the next step. Reply with your quote and XL Eagle handles the rest.