View full contract details ↓ View on SAM.gov ↗
BLM-CO TRFO BASIN WELL AND WATER SYSTEM IMPROVEMENTS AMENDMENT 2 (09/01/2026)- This amendment is to extend the due date to 09/17/2026 8am MD, final questions due 08/14/2026 8am MD, add Q&A, and update evaluation information. There will not be a formal site visit. Unaccompanied site visits are available. Please utilize the coordinates in the PWS to properly locate the site.
This solicitation is being amended to reopened to change the set aside to 100% Total Small Business due to original set-aside resulting in no responses, post it to open market (SAM.gov), update terms and conditions, and adding attachments. All questions are due by September 14, 2026 8am MD. This is a solicitation announcement for well improvements of a well house located at the Bureau of Land Management TRFO Basin Well, Montrose County, Colorado near Naturita, CO. 1.1 PROJECT DESCRIPTION Contractor shall provide a turnkey solar powered, well water system that automatically provides and maintains water to a wildlife drinking tank with minimal human input except winterization and annual maintenance.
System shall be designed to have a solar pumping system at an existing water well. Provide water to an elevated buried storage tank. The buried storage tank will gravity feed the drinking tank. An additional tee and valve shall be provided for a future upgrade for a stockwater tank.
System shall be designed to be freeze proof and operational in the winter to the frost free hydrant at the drinking tank. 1.2 LOCATION Latitude: 38.06529167� N Longitude: -108.63154723� W From Naturita, CO. Travel south on CO-141 for approximately 12 miles. Turn right (west) on County Road U29.
Travel approximately 5 miles. The project is on the left (south). 1.3 WORK SCHEDULE Work shall be completed within 360 days of the Notice…
More like this: Construction & Renovation contracts in Colorado · Water & Wastewater contracts in Colorado
XL Eagle · Certified Small Business · CAGE 11R42 · info@xleagle.com · (832) 380-5845