Apply with your email → View on SAM.gov ↗
At Building 510, the Contractor will reconfigure the HVAC and DDC Controls throughout and replace mold damaged drywall. Contractor is responsible for moving and storing all contents of the building. All work performed must meet local, state, and federal codes including but not limited to all applicable Department of Air Force Requirements (DAFMAN and DAFI), UFC-430-01FA, Dobbins Design Guide and Dobbins' specifications 101, 1560, 1330 and the United Facilities Criteria's (UFC).
Just your email — we'll send the details and the next step right away.
More like this: HVAC contracts in Georgia
XL Eagle · Certified Small Business · CAGE 11R42 · info@xleagle.com · (832) 380-5845