View full contract details ↓ View on SAM.gov ↗
The Subcontractor shall perform all work as described in the Statement of Work titled the, �CUB Boiler 1 PLC Replacement� All work shall include transportation, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision as required to construct the project described in the scope of work, and the detailed description contained herein.
More like this: HVAC contracts in Illinois
XL Eagle · Certified Small Business · CAGE 11R42 · info@xleagle.com · (832) 380-5845