Amendment 1 - The purpose of this amendment is to incorporate the following: Attachment 1: Amend 1 Site Showing Technical Notes Q&A Site Visit sign-in sheet Questions and Answers Site Visit Technical Notes Attachment 2: Amend 1 SF 1442 SF 1442 - Please complete and include with your The quote due date is extended to 5pm Central Time on August 28??. Note: changed from Eastern time to local Central Time to limit confusion. Please review all attached in their entirety. Orginal Solicitation This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12.
This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12FPC326Q0043 is issued as a Request for Quotation (RFQ) for Cedar Creek Watershed 16 and 16A Remedial Repairs. The upstream wave berm repair for both Sites 16 and 16A will consist of stripping and stockpiling the topsoil from the embankment eroded area; performing excavation and earthfill activities to achieve the specified rock riprap subgrade; placing and anchoring geotextile fabric on the approved subgrade; placing rock riprap to the required thickness and limits as shown in the construction drawings; backfilling the toe of the rock riprap with earthen materials; blending the earthwork above the rock riprap into the existing embankment; establishing vegetation; and removing and reconstructing fence as shown on the construction drawings.
The existing plunge basins for both sites have experienced erosion along the side slopes of the basin and outlet channel. To prevent/retard future erosion, the basins will be armored with a blanket of rock riprap. [Site 16A only] Plunge basin erosion has also caused damage to the…
More like this: Construction & Renovation contracts in Texas · Paving & Concrete contracts in Texas
XL Eagle · Certified Small Business · CAGE 11R42 · info@xleagle.com · (832) 380-5845