Federal contract opportunity · W9127N26BA024

Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement (W9127N26BA024)

Solicitation W9127N26BA024 · SAM.gov · Oregon · Due September 18, 2026

View full contract details ↓ View on SAM.gov ↗

Key facts

Source
SAM.gov ↗
Due
September 18, 2026

What the gig needs

The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34�4�� out-to-out, with two 11�0� travel lanes, two 2�0� shoulders, a 5�0� sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south.

Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts.

To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lead and asbestos removal will be required as part of this requirement.

Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.

Files & drawings

Recent similar awards

  • Department of Agriculture — $332,737 — July 7, 2027
  • Department of Agriculture — $220,143 — June 1, 2027
  • Department of Agriculture — $162,012 — May 3, 2027
  • Department of Agriculture — $166,746 — October 1, 2026
  • Department of Agriculture — $818,380 — October 1, 2026

Recent comparable awards for similar work — not necessarily this exact solicitation's history.

How to submit your bid

Go to SAM.gov, search for solicitation W9127N26BA024, and submit before September 18, 2026.

Get a full proposal by email

Building a full, compliant proposal takes a few minutes — where should we send it?

You're in. Check your inbox — we just emailed you the next step.

Similar contracts

More like this: Construction & Renovation contracts in Oregon

XL Eagle · Certified Small Business · CAGE 11R42 · info@xleagle.com · (832) 380-5845