View full contract details ↓ View on SAM.gov ↗
*** Amendment 0001 posted, revised SOW, PBS and the quote due date has been extended to 18 September 2026*** Barren River Lake Repair Drainage Ditch at Tailwater Stilling BasinThe contractor??????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????s work and responsibility will include furnishing all labor, materials, supplies, tools and, equipment necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work will shall begin within 10 calendar days of Notice to Proceed and must conclude 180 calendar days after Notice to Proceed.Location:United States Corps of EngineersBarren River Lake11088 Finney RdGlasgow, KY 42141This procurement is 100% set-aside for Small Business, NAICS 238910, Size Standard $19M.Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.Note: The contract award will be based on lowest total price to the Government.** Bid Bonds are required and must be provided at the same time of your submission. **A site visit is highly recommended, Contractors are encouraged to attend a site visit to review the complexities of the w…
XL Eagle · Certified Small Business · CAGE 11R42 · info@xleagle.com · (832) 380-5845